Process Planning and Cost Estimation | Set 2

1. Cutting T-slots can be performed more effectively by milling machine.

Correct : B. vertical

2. Slotting can be performed more effectively by milling machine.

Correct : C. both horizontal and vertical

3. In shaper, the tool head consists of

Correct : D. all of the mentioned

4. The main parts of shaper are

Correct : D. all of the mentioned

5. The body of the shaper comprises of

Correct : D. all of the mentioned

6. The base of the shaper is a heavy cast iron casting.

Correct : A. true

7. The base of the shaper is not able to withstand the vibration.

Correct : B. false

8. Drive mechanism consists of

Correct : D. all of the mentioned

9. Quick return mechanism is responsible for ram movement.

Correct : A. true

10. The top of the body provides guideways for

Correct : A. ram

11. Product development is a central business activity because?

Correct : D. all of the mentioned

12. Which of the following statement is false?

Correct : C. an opportunity funnel is a mechanism for collecting product ideas from specific source

13. Which of these are incorrect for the product plan?

Correct : A. no need to revise product plan frequently

14. Designs are periodically modified to

Correct : D. all of the mentioned

15. Properties of workpiece materials are

Correct : D. all of the mentioned

16. Expendable mold and permanent mold are the parts of          manufacturing process.

Correct : B. casting

17. In         type of manufacturing process, material is wasted. It is in the form of chips.

Correct : A. machining process

18. With the use of Jigs and fixture total cost of production

Correct : B. decreases

19. With the use of Jigs and fixture quality control expenses will

Correct : A. reduce

20. What is the main cause of accidents in urban areas?

Correct : A. improper planning

21. Demographic factors do not include

Correct : A. gdp

22. The traffic population is estimated by

Correct : B. geometric method

23. Which of the following data is not required to prepare an estimate?

Correct : A. amplitude

24. Estimating is the technique of calculating the various quantities and is needed for controlling the expenditure during the execution of the work.

Correct : A. true

25. is required for preliminary studies of various aspects of a work or project.

Correct : D. abstract estimate

26. Approx. cost of a bridge of 3 spans of 50 m each span @Rs.30000/- per running m of span comes to 3*50*30000 = Rs. 45 lakhs.

Correct : A. true

27. 1 ESTIMATION OF DIFFERENT TYPES OF JOBS

Correct : B. false

28. is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

Correct : D. plinth area estimate

29. is the amount provided in the estimate and bill of quantities for some specialised work to be done by a specialised firm; whose details are not known at the time of preparing estimate.

Correct : B. provisional sum

30. estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

Correct : B. maintenance estimate

31. A large work or project may consists of several building or small works and each of these work is known as

Correct : A. sub-work

32. The term                              is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.

Correct : C. day-work

33. Shaping of metal by squeezing them in between two or more dies in order to obtain desire shape is done by?

Correct : B. forging

34. Forging is carried out at which temperature?

Correct : C. below or above recrystallization temperature

35. In which of the forging process metal is kept in between a pair of dies and no gutter is provided in the lower die?

Correct : C. impression dies

36. In which of the following forging process poor material utilization occurs?

Correct : A. open die

37. The                energy consumption is a drawback of the foundry.

Correct : A. high

38. defects in castings cannot be identified easily.

Correct : A. internal

39. The                directional properties are imparted to the castings made in foundries.

Correct : A. single

40. is the speed at which the metal is removed by the tool from the work piece.

Correct : B. cutting speed

41. is the distance the tool advances for each revolution of the work.

Correct : A. feed

42. The depth of cut is the           distance measured from the machined surface to the surface of the work piece, which is uncut.

Correct : B. perpendicular

43. Which of the following represents the formula for the depth of cut? d1=diameter of work surface before machining and d2=diameter of the machined surface

Correct : D. (d1-d2)/2

44. Which of the following represents the formula for the machining time? s=feed of the job per revolution, l=length of the job, n=rpm.

Correct : A. l / (s*n)

45. For lathe operations, work piece can be hold

Correct : C. either between centres or on mandrel

46. Reaming and counter boring can be performed by

Correct : B. face plates and angle plates

47. Shaping can be performed more effectively by              milling machine.

Correct : B. vertical

48. Form cutting can be performed more effectively by              milling machine.

Correct : A. horizontal

49. Slab milling can be performed more effectively by              milling machine.

Correct : A. horizontal

50. Drilling can be performed more effectively by              milling machine.

Correct : B. vertical

51. Boring can be performed more effectively by              milling machine.

Correct : B. vertical

52. Dovetailing can be performed more effectively by              milling machine.

Correct : B. vertical

53. Straddle milling can be performed more effectively by              milling machine.

Correct : A. horizontal

54. Angular milling can be performed more effectively by              milling machine.

Correct : C. can’t say anything

55. Cutting T-slots can be performed more effectively by              milling machine.

Correct : B. vertical

56. Slotting can be performed more effectively by              milling machine.

Correct : C. both horizontal and vertical

57. Which of the following part of shaper supports the entire load of the machine?

Correct : A. base