Quiznetik

Process Planning and Cost Estimation | Set 1

1. Which of these is not a part of product planning?

Correct : D. finalizing process

2. How does marketers study customers and products for the generation of ideas?

Correct : D. all of the mentioned

3. Which of these does not account for Passive channels fo opportunity funnels?

Correct : C. monitoring trends

4. Which of these is false about the opportunity statement?

Correct : A. opportunity statement collects product ideas into opportunity funnel

5. Decisions through which an organization follows development?

Correct : A. competitive strategy

6. What are the factors Profitability depends on?

Correct : D. all of the mentioned

7. The expected qualities of a product are

Correct : D. all of the mentioned

8. The life cycle of a product includes

Correct : D. all of the mentioned

9. Life-cycle engineering is also called

Correct : A. green design

10. Sustainable manufacturing is required for

Correct : D. all of the mentioned

11. The mechanical properties of good product material are

Correct : D. all of the mentioned

12. The physical properties of good product material are

Correct : D. all of the mentioned

13. The chemical properties of good product material are

Correct : D. all of the mentioned

14. Considerations of costing systems are

Correct : D. all of the mentioned

15. Which manufacturing process includes the powder metallurgy?

Correct : B. forming and shaping

16. Which of the following is not included in forming and shaping process?

Correct : D. broaching

17. Expendable mold and permanent mold are the parts of manufacturing process.

Correct : B. casting

18. Casting includes grinding process.

Correct : B. false

19. Brazing is a type of metal joining process.

Correct : A. true

20. Which of the following processes are included in finishing?

Correct : B. polishing and lapping

21. Machining process deals with drawing.

Correct : B. false

22. Which of the following is not the type of finishing process?

Correct : A. diffusion bonding

23. Which of the following is not the type of joining process?

Correct : D. none of the mentioned

24. Which of the following is the type of permanent joining process?

Correct : C. both welding and soldering

25. Which of the following is the type of temporary joining process?

Correct : B. mechanical joining

26. In type of manufacturing process, material is wasted. It is in the form of chips.

Correct : A. machining process

27. Which of the following is included in machining process?

Correct : C. drilling

28. With the use of Jigs and fixture rate of production will

Correct : A. increase

29. Jigs and fixture increases the accuracy of the parts.

Correct : A. true

30. Jigs And fixture are used to provide interchangeability.

Correct : A. true

31. With the use of Jigs and fixture

Correct : A. labour cost decreases

32. Which of the following is not correct about fixture?

Correct : D. it is used to guide the cutting tool

33. Which of the following is not correct about jig?

Correct : D. none of the mentioned

34. In which of the following operation jigs are preferred over fixture?

Correct : A. drilling

35. Number of degree of freedom of a workpiece in space is equal to

Correct : B. 12

36. Land use, transportation and road network plans are

Correct : A. inter linked

37. The first stage in the function of traffic engineering department is?

Correct : B. collection of data

38. Traffic forecast is not influenced by

Correct : D. weather

39. The NHDP are being undertaken by private companies on the basis of

Correct : C. bot

40. The traffic will increase if the

Correct : B. price of vehicles decreases

41. The process of working out the cost per unit of each item is known as

Correct : C. data

42. While fixing rate per unit of an item, the quantity of materials and labour needed for one unit of an item are strictly per

Correct : B. standard data book

43. In the case of works which require some special types of equipment, an amount of

Correct : A. 1-2

44. Which of the following is not a method used for preparing approximate estimates?

Correct : D. cylindrical base method

45. In the plinth area method, the cost of construction is computed by the multiplication of

Correct : C. plinth area and plinth area rate

46. As per IS 3861-1966, which of the following areas should not be included while calculating the plinth area of a building?

Correct : D. area of lofts

47. For the preparation of approximate estimates, cubical contents method is more accurate than the unit base method and plinth area method.

Correct : A. true

48. In the cubical contents method, the cost of a structure is computed by the multiplication of total cubic contents and

Correct : C. local cubic rate

49. Estimating is the technique of calculating the various quantities and is needed for controlling the expenditure during the

Correct : B. standard data book

50. is required for preliminary studies of various aspects of a work or project.

Correct : D. abstract estimate

51. Approximate cost of a hostel building for 100 students @Rs.10000/- per student works out as Rs. 10 lakhs.

Correct : A. true

52. Approximate cost of sewerage project for a population of one [email protected] Rs. 10/- head works out as Rs. 10 lakh.

Correct : B. false

53. Cube rate estimate is less accurate as compared to the plinth area estimate as the height of the building is also compared.

Correct : B. true

54. For storeyed building plinth area estimate is not prepared for each storey separately.

Correct : B. false

55. is prepared on the basis of plinth area of building, the rate being deducted from the cost of similar building having similar specification, heights and construction, in the locality.

Correct : D. plinth area estimate

56. In this method approx. total length of walls is found in running metre and this total length multiplied by the rate per running metre of wall gives a fairly accurate cost.

Correct : C. approximate quantity method estimate

57. estimate is a detailed estimate and is prepared to maintain the structure or work in proper order and safe condition.

Correct : B. maintenance estimate

58. The term is used to denote a procedure of costing or valuing an item of work on the basis of actual labourers and materials required.

Correct : C. day-work

59. Which of the following is a type of forging?

Correct : D. hold dies

60. In which of the following forging metal is kept in the lower die?

Correct : A. open die

61. In which of the forging process metal is kept in between a pair of dies and a gutter is provided in the lower die?

Correct : B. closed die

62. The extra metal which settles down in the gutter is known as?

Correct : A. flash

63. In which of the following forging process no flash is formed?

Correct : B. closed die

64. Cogging, which is also called as drawing out, is basically?

Correct : A. open die forging operation

65. In rolling operation, the roll rotates with surface velocity?

Correct : C. equal to speed of the incoming metal

66. A round billet made of 70-30 brass is extruded at a temperature of 675°C. The billet diameter is 125 mm, and the diameter of the extrusion is 50 mm. Calculate the extrusion force required.

Correct : C. 5.6 mn

67. In which type of extrusion, a billet is placed in a chamber?

Correct : A. forward

68. In which type of extrusion, the die moves toward the unextruded billet?

Correct : B. indirect

69. In which type of extrusion, the billet is smaller in diameter than the chamber?

Correct : C. hydrostatic

70. Scope of automation in foundry process is

Correct : A. low

71. Which of the following is an advantage of the Green sand molding process used in a foundry?

Correct : D. all of the mentioned

72. The energy consumption is a drawback of the foundry.

Correct : A. high

73. Majority parts in transportation vehicles are made by the foundry processes.

Correct : A. true

74. defects in castings cannot be identified easily.

Correct : A. internal

75. The directional properties are imparted to the castings made in foundries.

Correct : A. single

76. In the foundry, the metal joining process is employed.

Correct : B. false

77. Foundry process is used to make intricate parts.

Correct : A. true

78. is the speed at which the metal is removed by the tool from the work piece.

Correct : B. cutting speed

79. Which of the following represents the formula for cutting speed? cs =cutting speed, D= diameter of work, N= rpm.

Correct : A. cs = (3.14*d*n)

80. is the distance the tool advances for each revolution of the work.

Correct : A. feed

81. Which of the following is the unit of the feed?

Correct : B. mm / revolution

82. The depth of cut is the distance measured from the machined surface to the surface of the work piece, which is uncut.

Correct : B. perpendicular

83. Which of the following represents the unit of metal removal rate?

Correct : C. mm*mm*mm/revolution

84. Which of the following represents the unit for machining time?

Correct : C. minute

85. For general purposes, ratio of the depth of cut to the feed varies from

Correct : A. 10:1

86. Which of the following is used to drive the work piece?

Correct : C. both carriers and catch plates

87. Drilling is performed by holding the work by a chuck.

Correct : A. true

88. Knurling can be performed by special attachments.

Correct : B. false

89. Grinding can be performed by

Correct : C. special attachments

90. Taper boring and the under boring can be performed by

Correct : B. face plates or angle plates

91. Milling can be performed by

Correct : D. special attachments

92. Spinning can be done by

Correct : A. centres

93. Eccentric turning can be performed by using special attachments.

Correct : B. false

94. Shaping can be performed more effectively by milling machine.

Correct : B. vertical

95. Form cutting can be performed more effectively by milling machine.

Correct : A. horizontal

96. Slab milling can be performed more effectively by milling machine.

Correct : A. horizontal

97. Drilling can be performed more effectively by milling machine.

Correct : B. vertical

98. Boring can be performed more effectively by milling machine.

Correct : B. vertical

99. Dovetailing can be performed more effectively by milling machine.

Correct : B. vertical

100. Angular milling can be performed more effectively by milling machine.

Correct : C. can’t say anything