Software Testing and Quality Assurance (STQA) | Set 1

1. Software project management comprises of a number of activities, which contains _.

Correct : A. system software

2. Software is defined as ____ .

Correct : D. all above

3. What are the signs that a software project is in trouble

Correct : D. all of the above

4. A Project can be characterized as _ .

Correct : D. none

5. CMM model in Software Engineering is a technique of ______ .

Correct : B. improve the software process.

6. Project risk factor is considered in which model

Correct : A. spiral model

7. Effective software project management focuses on the four P’s. What are those four P’s?

Correct : B. people, product, process, project

8. What are the signs that a software project is in trouble?

Correct : D. all

9. Software quality assurance is an umbrella activity.

Correct : A. true

10. Which of the following are the valid relationships in Use Case Diagrams

Correct : D. all

11. Which one of the following is not an Evolutionary Process Model?

Correct : D. all of the mentioned

12. The Incremental Model is a result of combination of elements of which two models?

Correct : C. linear model & prototyping model

13. The spiral model was originally proposed by

Correct : B. barry boehm

14. Spiral Model has user involvement in all its phases.

Correct : B. false

15. If you were to create client/server applications, which model would you go for?

Correct : C. concurrent model

16. Which of the following is not a phase of SDLC?

Correct : D. all

17. Selection of particular life cycle model is based on,

Correct : D. all

18. Which of the following are incremental developmental models?

Correct : C. both a and b

19. In a college,students are asked to develop a software. Which model would be preferable

Correct : D. code nad fix model

20. In waterfall model, output of one phase is input to next phase.

Correct : A. true

21. The first step in Software Development Life Cycle(SDLC) is

Correct : A. preliminary investigation and analysis

22. The detailed study of existing system is referred to as :

Correct : B. system analysis

23. System analysis and design phase of Software Development Life Cycle (SDLC)

Correct : C. all of these

24. Prototyping aims at :

Correct : A. end user understanding and approval

25. What is a prototype ?

Correct : B. mini-model of the proposed system

26. The phase of System Development associated with creation of the test data is

Correct : C. system acceptance

27. Which of the following is not a named phase in the System development life cycle ?

Correct : A. assessment

28. What is the final outcome of the requirements analysis and specifications phase ?

Correct : B. the srs document

29. QFD stands for

Correct : C. quality function deployment

30. A Use-case actor is always a person having a role that different people may play.

Correct : B. false

31. The user system requirements are the parts of which document ?

Correct : B. srs

32. What are the types of requirement in Quality Function Deployment(QFD) ?

Correct : D. normal, expected, exciting

33. Traceability is not considered in Requirement Analysis.

Correct : B. false

34. Which of the following statements about SRS is/are true ? i. SRS is written by customer ii. SRS is written by a developer iii. SRS serves as a contract between customer and developer

Correct : C. all are true

35. Risk management is one of the most important jobs for a

Correct : D. project manager

36. Which of the following risk is the failure of a purchased component to perform as expected?

Correct : A. product risk

37. Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?

Correct : C. management change

38. Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.”?

Correct : A. technology change

39. What assess the risk and your plans for risk mitigation and revise these when you learn more about the risk?

Correct : A. risk monitoring

40. Which of the following risks are derived from the organizational environment where the software is being developed?

Correct : D. organizational risks

41. Which of the following risks are derived from the software or hardware technologies that are used to develop the system?

Correct : B. technology risks

42. Which of the following term is best defined by the statement: “Derive traceability information to maximize information hiding in the design.”?

Correct : C. requirements changes

43. Which of the following strategies means that the impact of the risk will be reduced?

Correct : B. minimization strategies

44. Risk management is now recognized as one of the most important project management tasks.

Correct : A. true

45. Choose the correct option according to the given statements regarding risk management.Statement 1: A risk is a potential problem—it might happen, it might not. Statement 2: Managers, software engineers, and customers participate in risk analysis and management. Statement 3: Only Managers participate in risk analysis and management.

Correct : A. statement 1 and 2 are correct.

46. Reactive risk management is sometimes described as:

Correct : A. fire fighting mode

47. Software risk always involves two characteristics. What are those characteristics?

Correct : A. uncertainty and loss

48. What is/are the different types of risk may occur when you develop software?

Correct : D. all of the above

49. Effective risk management plan needs to address which of these issues?

Correct : D. all of the above.

50. Risk mitigation is a risk activity. Risk monitoring is a activity

Correct : A. avoidance, project tracking.

51. Which of the following categories is part of the output of software process?

Correct : D. all of the mentioned

52. Which of the following is the process of assembling program components, data, and libraries, and then compiling and linking these to create an executable system?

Correct : A. system building

53. Which of the following is / are the output of the Software Process?

Correct : D. all of the above

54. As the reliability increases, failure intensity _.

Correct : A. decreases

55. Which of the following term describes testing?

Correct : B. evaluating deliverable to find errors

56. What is Cyclomatic complexity?

Correct : B. white box testing

57. Lower and upper limits are present in which chart?

Correct : A. run chart

58. Maintenance testing is performed using which methodology?

Correct : C. breadth test and depth test

59. White Box techniques are also classified as

Correct : B. structural testing

60. Exhaustive testing is

Correct : C. impractical but possible

61. Which of the following is/are White box technique?

Correct : D. all of the mentioned

62. What are the various Testing Levels?

Correct : D. all of the mentioned

63. Boundary value analysis belong to?

Correct : B. black box testing

64. Alpha testing is done at

Correct : A. developer’s end

65. E-Commerce software testing follows different approach than gaming software testing. Which testing principle implies this?

Correct : B. testing is context dependent

66. When a cost to remove defect is not high?

Correct : A. during requirement analysis

67. In software development life cycle , who is the best person to catch a defect?

Correct : D. business analyst

68. Which of the following statement is true?

Correct : B. exhaustive testing is possible but impracticable

69. Software tester focuses more on complex part of the software. Which of the following testing principle implies this?

Correct : D. defect clustering

70. The defect cluster change over time. Which of the following testing principle implies this?

Correct : B. pesticide paradox

71. When testing principles are useful?

Correct : D. throughout life-cycle

72. In white box testing what do you verify?

Correct : D. all of these

73. End result of Software Requirement Analysis is ________

Correct : A. functional and behavioral

74. The inputs for developing a test plan are taken from

Correct : B. business plan

75. Testing beyond normal operational capacity is __________

Correct : C. stress testing

76. Test wares are handed over to maintenance team during which phase?

Correct : B. test closure activity

77. What are the criteria to decide the testing efforts? 1. Time and budget 2. Size of development team 3. Size of testers 4. Risk associated with project

Correct : C. 1, 4

78. Who leads a formal review process?

Correct : B. moderator

79. A chronological record of relevant details about the execution of tests is called as, a _______

Correct : D. test log

80. Non functional testing is performed only at system testing level. True or false.

Correct : B. false

81. Which of the following is not other name for structural testing?

Correct : C. behavioral testing

82. Which things are measured by software Test effectiveness?

Correct : D. all of the above

83. In which of the following type of testing, testing is done without planning and documentation?

Correct : C. ad hoc testing

84. When should company stop the testing of a particular software?

Correct : B. it depends on the risks for the system being tested

85. ___________ refers to a different set of tasks ensures that the software that has been built is traceable to Customer Requirements.

Correct : C. validation

86. Who performs the Acceptance Testing?

Correct : B. end users

87. Before handing over the software to the client, which testing is to be done in-house?

Correct : A. alpha

88. Requirement Engineering is not concern with _.

Correct : A. requirement design

89. When an expected result is not specified in test case template then _.

Correct : B. it may be difficult to determine if the test has passed or failed.

90. End result of Software Requirement Analysis is _.

Correct : A. functional and behavioral

91. Bug status is set to postpone due to _.

Correct : D. data may be unavailable.

92. Which Testing is performed first?

Correct : D. static testing

93. Verification and Validation uses _.

Correct : A. internal and external resources respectively.

94. Testing beyond normal operational capacity is _.

Correct : C. stress testing

95. The expected results of the software is _.

Correct : A. only important in system testing

96. Test cases are created in which phase?

Correct : A. test specification

97. 7n test cases are generated in which case of Boundary Value Analysis?

Correct : B. roust worst case

98. Which testing cannot be performed on first build of the software?

Correct : C. a,b

99. Which testing is performed with Planning and Documentation?

Correct : D. end-to-end testing

100. GUI means

Correct : A. graphical user interface