Software Engineering | Set 5

1. Which of these benefits can be achieved when software is restructured?

Correct : D. all of the mentioned

2. Data re-engineering may be part of the process of migrating from a file-based system to a DBMS-based system or changing from one DBMS to another.

Correct : A. true

3. BPR stands for

Correct : A. business process re-engineering

4. Source code translation is a part of which re-engineering technique?

Correct : C. restructuring

5. In reverse engineering process, what refers to the sophistication of the design information that can be extracted from the source code?

Correct : C. abstraction level

6. In reverse engineering, what refers to the level of detail that is provided at an abstraction level?

Correct : B. completeness

7. The core of reverse engineering is an activity called

Correct : C. extract abstractions

8. What have become de rigueur for computer-based products and systems of every type?

Correct : A. guis

9. Forward engineering is also known as

Correct : D. both renovation and reclamation

10. Reverse engineering is the process of deriving the system design and specification from its

Correct : C. source code

11. Reverse engineering techniques for internal program data focus on the definition of classes of objects.

Correct : A. true

12. Which of the following steps may not be used to define the existing data model as a precursor to re-engineering a new database model:

Correct : D. discover user interfaces

13. Much of the information necessary to create a behavioral model can be obtained by observing the external manifestation of the existing

Correct : B. interface

14. Extracting data items and objects, to get information on data flow, and to understand the existing data structures that have been implemented is sometimes called

Correct : A. data analysis

15. Transformation of a system from one representational form to another is known as

Correct : D. both re-factoring and restructuring

16. Which of the following is not an objective of reverse engineering?

Correct : D. to assist migration to a case environment

17. Why is decomposition technique required?

Correct : C. all of the mentioned

18. Cost and effort estimation of a software uses only one forms of decomposition, either decomposition of the problem or decomposition of the process.

Correct : B. false

19. If a Direct approach to software project sizing is taken, size can be measured in

Correct : A. loc

20. Which software project sizing approach develop estimates of the information domain characteristics?

Correct : A. function point sizing

21. How many forms exists of Barry Boehm’s COCOMO Model?

Correct : B. three

22. Who suggested the four different approaches to the sizing problem?

Correct : D. putnam and myers

23. In many cases, it is often more cost- effective to acquire, rather than develop, computer software.

Correct : A. true

24. A make-buy decision is based on whether

Correct : D. all of the mentioned

25. Which of the following is not one of the five information domain characteristics of Function Point (FP) decomposition?

Correct : C. external process

26. The project planner must reconcile the estimates based on decomposition techniques to produce a single estimate of effort.

Correct : B. false

27. Programming language experience is a part of which factor of COCOMO cost drivers?

Correct : A. personnel factor

28. If an Indirect approach is taken, then the sizing approach is represented as

Correct : B. fp

29. Which of the following is the reason that software is delivered late?

Correct : D. all of the mentioned

30. Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks?

Correct : B. software project scheduling

31. Every task that is scheduled should be assigned to a specific team member is termed as

Correct : C. defined responsibilities

32. What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project?

Correct : A. task set

33. Ensuring that no more than the allocated number of people are allocated at any given time in Software Scheduling is known as

Correct : B. effort validation

34. What is used to determine the recommended degree of rigor with which the software process should be applied on a project?

Correct : B. adaptation criteria

35. What evaluates the risk associated with the technology to be implemented as part of project scope?

Correct : B. preliminary concept planning

36. Which of the following is not an adaptation criteria for software projects?

Correct : B. customers complaints

37. Which of the following is a project scheduling method that can be applied to software development?

Correct : D. both pert and cpm

38. A technique for performing quantitative analysis of progress is known as

Correct : B. eva

39. What is the recommended distribution of effort for a project?

Correct : A. 40-20-40

40. A project usually has a timeline chart which was developed by

Correct : A. henry gantt

41. Risk management is one of the most important jobs for a

Correct : D. project manager

42. Which of the following risk is the failure of a purchased component to perform as expected?

Correct : A. product risk

43. Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.”?

Correct : A. technology change

44. What assess the risk and your plans for risk mitigation and revise these when you learn more about the risk?

Correct : A. risk monitoring

45. Which of the following risks are derived from the organizational environment where the software is being developed?

Correct : D. organizational risks

46. Which of the following risks are derived from the software or hardware technologies that are used to develop the system?

Correct : B. technology risks

47. Which of the following term is best defined by the statement: “Derive traceability information to maximize information hiding in the design.”?

Correct : C. requirements changes

48. Which of the following strategies means that the impact of the risk will be reduced?

Correct : B. minimization strategies

49. Risk management is now recognized as one of the most important project management tasks.

Correct : A. true

50. 6 IDENTIFICATION- RMMM PLAN-CASE TOOLS

Correct : D. all of the mentioned

51. Which one is not a risk management activity?

Correct : B. risk generation

52. What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss?

Correct : A. risk exposure

53. What threatens the quality and timeliness of the software to be produced?

Correct : D. technical risks

54. What threatens the viability of the software to be built?

Correct : B. business risks

55. Which of the following is not a business risk?

Correct : C. lack of documented requirements or software scope

56. Which of the following is a systematic attempt to specify threats to the project plan?

Correct : D. risk projection

57. Which risks are associated with the overall size of the software to be built or modified?

Correct : C. product size risks

58. Which risks are associated with constraints imposed by management or the marketplace?

Correct : A. business impact risks

59. Computer system is a

Correct : A. Hardware

60. Object model is a

Correct : C. System model

61. Software engineering is an engineering discipline concerned with

Correct : D. All the above

62. A workflow model represents

Correct : A. Sequence of activities

63. Sensor component

Correct : C. Collects information from system environment

64. Which is the correct order ?

Correct : A. System development ? system installation ? system operation

65. Sensor component is a

Correct : A. Functional component

66. Which one is not the non-functional activity ?

Correct : C. Coordination

67. Sub system is

Correct : B. Independent system

68. System architecture model identifies

Correct : D. Hardware and software components both

69. Which one is functional component ?

Correct : C. Computation

70. A class room in a school is a

Correct : B. Sub-system

71. Floating point process is a

Correct : B. Computation component

72. Digital-analog converter that converter digital input into analog output is a

Correct : D. Interface component

73. In software system requirements, the functional requirement for the system describes

Correct : B. Factors of system development

74. In software system requirements, the interface requirements are

Correct : C. Requirements that are derived from the interface of existing and proposed systems

75. Validation plan describes

Correct : B. Schedule procedure

76. Software requirement specification is

Correct : A. The official statement of what is required of the system developers

77. What is Ethnography

Correct : B. Observational technique used to understand social and organizational requirements

78. In Data Processing model

Correct : A. Here data-flow diagram show, how data is processed at different stages in the system. These are behavioral models

79. In Data recording

Correct : B. It registers all/ selected activities of a computer system.

80. Thermo couple in furnace is a

Correct : C. Sensor component

81. In block diagrams, relationship between components is shown by

Correct : D. Lines/Arrows

82. Cities, states and country can be defined as

Correct : A. Subsystem – Cities, states: System – country

83. Which of the following is correct system design process ?

Correct : C. Identify system – develop system – operate system

84. Making different sub-system to work together is

Correct : C. System integration

85. System procurement process involves

Correct : C. A and B both

86. System decommissioning normally takes place

Correct : C. After the end of useful operational time

87. System operation takes place after

Correct : C. System installation

88. Software processes are

Correct : A. Activities involved in producing software system

89. Iterative model includes

Correct : D. Random model

90. In iterative process model, software process represents

Correct : B. Cycle of activities

91. In spiral development the software process form

Correct : B. Loops

92. Spiral development involves

Correct : C. A and B both

93. Requirement Engineering involves

Correct : D. All the above

94. Analysis and design workbench

Correct : A. It supports system modeling during the analysis and design stages of the software process

95. ANSI (American National Standards Institute) is

Correct : B. Organization responsible for approving U.S. standards

96. Aperiodic stimuli is

Correct : C. Stimuli that occurs irregularly

97. Which is not the part of software process ?

Correct : D. Software selling

98. Which one is not the generic process model ?

Correct : D. Marketing model

99. Spiral model is

Correct : A. Iterative model

100. Software design activities involved

Correct : C. Component design