1. ______ is an orderly grouping of independent components linked together
according to a plan to achieve a specific objective or goal.
Correct : A. System
2. A ---------------is a set or group of component that interact to accomplish some
purpose.
Correct : A. System
3. System consists of----------------
Correct : D. All of above
4. Elements of system.
Correct : D. All of above
5. We can define information system as a set of devices, procedures, rules but most of the
work performs manually
Correct : B. Manmade Information system
6. What are the characteristics of software?
Correct : D. All mentioned above
7. Compilers, Editors software come under which type of software?
Correct : B. Application software
8. -------- refers to the process of examining a business situation with the intent of improving it
through better procedures and methods.
Correct : D. System analysis
9. The process of generating analysis and design documents is known as
Correct : C. Reverse engineering
10. Which is the first step in the software development life cycle ?
Correct : C. Problem/Opportunity Identification
11. Decision makers who are concerned with tactical (short-term) operational problems and
decision making are
Correct : A. middle managers
12. A turnaround output is an example of
Correct : B. external output
13. Critical information for top management is provided by ....... information system.
Correct : C. executive
14. ________ expressly designed for the support of individual and collective decision making.
Correct : B. DSS
15. -----------The system which are represented conceptually non Physical systems are called
Correct : A. Abstract system
16. ------------it shows a two dimensional depicting system elements and their linkages.
Correct : A. Schematic Models
17. ---------------It shows the flow of material ,energy and information that hold system
together.
Correct : B. Flow system models
18. ------------- This type of model exhibits are pair of relationship such as activity time or cost
quantity.
Correct : C. Static system models
19. ---------------- It depict constantly an ongoing constantly changing the system
Correct : D. Dynamic system models
20. An -----------system is a one which does not provide for its own control or modification.
Correct : A. Open System
21. ----------system in one which automatically controls or modifies its own operation by
responding to data generated by the system itself.
Correct : B. Closed system
22. -------------------is represented by organization chart.
Correct : A. Formal Information system
23. -------------systems used organizational data as well as external data collected from
environment of the organization.
Correct : D. DSS
24. Effectiveness is a major goal of these types of systems.
Correct : A. Expert systems
25. ------------------system operates continuously to keep management abreast of what is
happening in all major areas
Correct : A. Execution Information system(EIS)
26. ----------------consists of individual computers may be workstations or multiple systems.
Correct : B. Integrated system
27. -------------is a unit that is part of a larger system that means a larger system divided into
subparts the subpart is known as --------------
Correct : C. Subsystem
28. -----------system collect,store,modify and retrieve the transaction of an organization.
Correct : D. Transaction processing system
29. -----------------is concerned with how a systems tied together in order to achieve common
goal thus forming integration.
Correct : C. Integration
30. --------means that parts of the organization depend on one another
Correct : B. Interdependence
31. Which one of the following is not a step of requirement engineering?
Correct : C. analysis
32. -----------is a first technical step in software process.
Correct : D. None of Above
33. -------- refers to the process of examining a business situation with the intent of improving
it through better procedures and methods.
Correct : A. Software Anticipation
34. What are the four dimensions of Dependability?
Correct : B. Availability, Reliability, Maintainability, Security
35. System analyst consist of following tasks:
Correct : A. Problem identification
36. --------- it include the study like can the work for the project is done with current equipment existing software technology and with available manpower.
Correct : B. Economic feasibility
37. ------- it include of study of cost of system.
Correct : C. Operational feasibility
38. --------- it include system be used if it developed and implemented.
Correct : A. Technical feasibility
39. Analyst used ------- method to collect information from individual or from group.
Correct : A. Interviews
40. Analyst used --------- method to collect information from person by asking standard
question to person or group of person.
Correct : A. Interviews
41. -------- interviews use of standardized question in either an open response or close
response format.
Correct : B. Structured Interviews
42. ----------- may be inefficient use of both respondent and interviewer time.
Correct : A. Unstructured Interviews.
43. Analyst use ----------to learn about feelings, opinions and general experiences or to explore
a process or problems.
Correct : A. open ended questionnaires
44. In ----------- analyst examines information that has been recorded about system and about
the users.
Correct : B. Interviews
45. The ------------ is produced at the culmination of the analysis task.
Correct : A. Software requirement specification
46. Software is defined as ____
Correct : D. All of the above
47. The objective of software engineering is to produce ----------
Correct : A. Software Product
48. ----------- are software systems delivered to customer with the documentation which
describes how to install and use the system.
Correct : A. Software Product
49. --------- These are stand-alone systems which are produced by a development organization
and sold on the open market to any customer who is able to buy them.
Correct : A. Generic Product
50. ------------- these are systems which are commissioned by a particular customer.
Correct : D. None of these
51. ------------- component should be designed and implemented so that it can be reused in
many different programs.
Correct : A. Reusability
52. A primary goal of software engineering is to improve the -------------and to increase the
productivity and job satisfaction of software engineers.
Correct : A. Quality of software product
53. A fundamental Principal of software engineering is to design software products that
minimize the intellectual distance between ----------- and solution.
Correct : A. Method
54. ------------ is outgrowth of hardware and system engineering.
Correct : B. Requirement engineering
55. ------------ provide automated or semi-automated support for methods.
Correct : A. Software engineering tools
56. ------------- encompass a broad array of tasks that include project planning and
estimation system analysis, design of data structure, program architecture, coding, testing
and maintenance.
Correct : A. Software engineering tools
57. ------------- are the glue that holds the methods and tools together and they enable rational
and timely development of computer software.
Correct : D. None of these
58. Software engineering needed for building -----------systems in a timely manner with high
quality.
Correct : A. Software
59. software engineering is a ----------------
Correct : A. Graphical technology
60. --------- provides the technical how to building software.
Correct : C. Software engineering Methods
61. Software is ------
Correct : B. Manufactured
62. Software does not-----------
Correct : A. Engineered
63. ------------ consists of a means of monitoring the software engineering processes and
methods used to ensure quality.