Construction Project Management | Set 1

1. In which of the following stages contract documents are prepared?

Correct : D. None of the above

2. In which of the following stages specifications are prepared?

Correct : A. Planning stage

3. In which of the following stages practicability of project is ensured?

Correct : B. Briefing stage

4. Which of the following is not role of contractor

Correct : A. To arrange land

5. Which of the following is not role of owner

Correct : C. To ensure quality of construction

6. Which of the following organization is widely used in PWD

Correct : C. Line and staff organization

7. Which of the following is/are disadvantage/s of Line and Staff organization?

Correct : D. All of the Above

8. In which of the following organization expert advice is available?

Correct : C. Line and staff organization

9. Which organization permits quick decision?

Correct : B. Line or military organization

10. Which of the following is not a characteristics of a Good organization?

Correct : C. It should be as big as possible

11. Road is the example of

Correct : B. Infrastructure construction.

12. What is the simplest and oldest type of organization?

Correct : B. Line or military organization

13. What is Span of management?

Correct : A. It is the number of persons to be supervised by a manager

14. What is organization?

Correct : A. Arrangement of persons in business

15. What is 4M of construction?

Correct : B. 4 resources for construction

16. In which type of tender advantage of keen bidding competition can be availed.

Correct : A. Open tender or public tender

17. What SMB stands for?

Correct : C. Standard measurement book

18. SD, mobilization advance and cost of materials given to contractor will be deducted from

Correct : A. RA bill

19. What EMD stands for?

Correct : B. Earnest money deposit

20. Which of the following contract is most suitable for road and bridges?

Correct : A. BOT contract

21. In which of the following contract; contractor tries to complete job quickly?

Correct : B. Cost plus fixed fee contract

22. In which of the following contract; contractor is quickly be agreed and work on job?

Correct : A. Cost plus percentage rate contract

23. In which of the following contract; contractor is not required to deposit SD?

Correct : C. Piece work agreement

24. In which of the following contract; contractor is required to offer a fixed sum for job in all respect as per given drawings and details?

Correct : B. Lump-sum contract

25. Extra items will cause headache in item rate contract

Correct : A. Right

26. Which of the following is/are advantages of item rate contract

Correct : D. All of the above

27. Specialized work needs departmental execution

Correct : B. Wrong

28. Contract system is suitable for big projects

Correct : A. Right

29. Departmental execution is suitable for small jobs

Correct : A. Right

30. Which of the following is not essential requirement for contract

Correct : D. Both Parties must be citizens of same country

31. PERT requires

Correct : C. Triple time estimate

32. CPM requires

Correct : A. Single time estimate

33. CPM stands for

Correct : B. Critical path method

34. CPM is

Correct : B. Activity oriented

35. PERT is

Correct : A. Event oriented

36. An activity is represented by

Correct : A. An arrow

37. An activity requires

Correct : B. Time and resources

38. Actual performance of a task is known as

Correct : B. An activity

39. PERT stands for

Correct : C. Programme evaluation and review techniques

40. The earliest method of project planning was

Correct : C. Bar chart

41. A drawback of bar chart is that

Correct : C. The sequence of activity is not clearly defined

42. A bar chart is drawn for

Correct : A. Time versus activity

43. Bar chart is also known as

Correct : D. Gantt chart

44. Bar chart is very popular because

Correct : A. It is very simple

45. Bar chart is suitable for

Correct : C. Minor work

46. Economic cost is the only reason for which a contractor should be conscious of construction safety.

Correct : B. FALSE

47. The construction industry has accounted for about .........% of all occupational injuries

Correct : C. 11

48. Carelessness is the cause of an accident that can be attributed to

Correct : D. None of the above

49. Which of the following cause of an accident can be attributed to organization?

Correct : B. Defective supervision of work

50. There are as many possible causes of accidents as there are occasions

Correct : A. TRUE

51. Who should be allowed to go below slab when centering is in position and concreting of slab is going on

Correct : C. Nobody

52. In case of cantilever beam, reinforcement must be placed at the ....... of the member.

Correct : A. Top

53. Full width of road should be taken for bituminous work at a time so that job is completed in time.

Correct : B. Disagree

54. Pile drivers should be kept near electricity line to get electricity

Correct : B. Disagree

55. Before starting piling work, a complete knowledge of underground structures (such as sewers, water pipeline, gas mains etc.) is essential.

Correct : A. Agree

56. If work of piling is to be carried out at night, minimum........... 'lux luminance lights should be used.

Correct : D. 100

57. Moving parts of all equipment should be

Correct : B. Provided with safety guards.

58. Heavy equipment, such as excavating machinery, trucks, dumpers, etc. should be kept away from the excavated sides at a distance not less than the depth of trench

Correct : A. Agree

59. Excavated material should be kept nearby from the edge of the trench

Correct : B. Disagree

60. Whenever workmen have to excavate in trenches in soil, soft rock or hard soil exceeding ............. m in depth, the trenches should be securely shored and timbered.

Correct : A. 2

61. Outputs of management control level is

Correct : C. Decisions and personal leadership

62. Special one time reports are information system used by

Correct : B. Top management

63. Formal reports are information system used by

Correct : C. Supervisor,foreman,clerk

64. Operational control is responsibility of

Correct : C. Supervisor,foreman,clerk

65. Strategic Planning is responsibility of

Correct : B. Top management

66. Which of the following is not a components of the system.

Correct : D. Decision making

67. System means

Correct : A. Group of various units

68. Management consists of .................................. levels.

Correct : C. Three levels-top level, middle level and lower level.

69. ....................... is an important element of group activities.

Correct : A. Management

70. The main function of MIS is to deal with government

Correct : B. Wrong

71. Negative attitude can be controlled by

Correct : B. Values

72. Care for male employees and justice for female and child worker can create positive attitude

Correct : B. Wrong

73. Positive, warm and committed attitude enhances

Correct : B. Team effort

74. ..................... is a function of values and perception of a person

Correct : C. Attitude

75. Person selects information that suits his

Correct : B. Values

76. Employees having their age more than..............years can become the members of the union.

Correct : B. 15

77. The first Trade union Act in India was passed in

Correct : A. 1926

78. CITU stands for

Correct : C. Centre of Indian Trade Union

79. Trade unions are voluntary organisations formed by laborers to protect their interest

Correct : A. Agree

80. Economical aspects of labour welfare includes

Correct : A. High wages, bonus, medical aid,

81. Better working conditions

Correct : B. Non financial incentive

82. Attendance bonus

Correct : A. Direct financial incentive

83. Meritorious service awards is

Correct : B. Non financial incentive

84. Gratuity is

Correct : C. Indirect financial incentive

85. Profit sharing bonus

Correct : A. Direct financial incentive

86. Leave encashment is

Correct : C. Indirect financial incentive

87. Wages of worker is liability of

Correct : C. Employer

88. Labor is perishable resource

Correct : A. Agree

89. The stack height for flooring tiles should not be more than........ m.

Correct : C. 1.0

90. The stack height for bricks should not be more than .......... m.

Correct : B. 1.5

91. Tests for performance of construction is done in

Correct : D. Commissioning stage

92. Which of the following are the qualities of good construction manager?

Correct : D. All of the above

93. The main function of the construction management is

Correct : D. All of the above

94. The construction of residential building are treated as

Correct : A. light construction

95. The construction of airports are treated as

Correct : B. heavy construction

96. A construction team includes

Correct : D. all of these

97. The field of activities of an engineer includes

Correct : D. all of above

98. F.W. Taylor introduced a system of organization known as

Correct : C. functional organization

99. In a functional organization

Correct : D. all of the above

100. The major principle of an organization is

Correct : D. all of these