Quiznetik

Advanced Construction and Equipments | Set 1

1. the art of driving piles into the ground was first established by______.

Correct : B. Romans

2. based on the function, piles can be classified into ______ types.

Correct : C. 8

3. which of the following piles is used to compact loose granular soil?

Correct : C. Compaction Piles

4. sheet piles are commonly used as ________ in hydraulic structure.

Correct : A. Bulk heads

5. the piles that are used for protecting structures from ships and floating object is _______.

Correct : B. Fender piles

6. Modern pile driving method was first invented by ________.

Correct : B. Nasmyth

7. the precast concrete piles are generally used for a maximum design load of about _______.

Correct : D. 80 tonnes

8. cast in situ piles may be classified in to_______.

Correct : C. Two

9. which of the following piles is a cast in situ type of concrete pile?

Correct : B. Raymond standard pile

10. composite piles are suitable for ______.

Correct : B. Project above the water table

11. piles are commonly driven in to the ground by means of special device called _______.

Correct : A. Pile driver and hammer

12. the types of hammer used for driving piles are _______.

Correct : D. All of mentioned

13. if a hammer is raised by stem and allowed to fall by gravity on top of the pile, it is called as ______.

Correct : C. Single acting hammer

14. single acting hammers provide an advantage in _______ type of soil.

Correct : A. Compact soil and hard soil

15. a ______ is defined as a temporary structure which is constructed so as to remove water and/or soil from an area and make it possible to carry on the construction work under reasonably dry conditions.

Correct : A. Cofferdam

16. a ______ is an embankment of some material.

Correct : C. Dike

17. _______ is the simplest form of cofferdam.

Correct : B. Earth fill cofferdam

18. ______ type of cofferdam is economical at places where rock is available in plenty.

Correct : C. Rock fill cofferdam

19. in _____ type of cofferdam consists of a mixture of sand and clay which is filled in a bag and placed instead of earth or rock to form a cofferdam.

Correct : D. Sand bag dikes

20. ______ it suitable when available working space is limited and the area to be enclosed is small.

Correct : A. Single wall cofferdam

21. when the area to be enclosed is large, it becomes essential to provide the ______ construction so as to give stability to the cofferdam.

Correct : C. Double wall cofferdam

22. _______ is useful when depth of water is about 6 meters to 10 meters.

Correct : A. Wood or steel sheeting cofferdam

23. the ______ is made of steel sheet piles and this type of cofferdam is proved successful in unwatering large areas.

Correct : B. Cellular cofferdam

24. a ______ consist of timber cribs.

Correct : C. Rock filled crib cofferdam

25. ______ is to be incorporated as a part of a permanent structure which have been proved to be economical.

Correct : D. Concrete cofferdam

26. ______ are the cofferdams which can be lifted, floated and placed in another position as soon as its purpose is served.

Correct : A. Suspended cofferdam

27. a _____ is define as a structure which is sunk through ground or water to exclude water and semi fluid material during the process of excavation of foundations.

Correct : B. Caisson

28. the ______ is suitable for caissons of open well type.

Correct : D. Cast-iron

29. the ______ is suitable for caisson shoes.

Correct : A. Reinforced cement concrete

30. the ______ is found to be the most suitable material for the construction of caisson.

Correct : C. Steel

31. the ______ was used as a material for the construction of caisson in the early stages of development of caisson.

Correct : B. Timber

32. a _____ caisson is open at top and closed at bottom.

Correct : D. Box caissons

33. a ______ is a caisson which is open at top as well as at bottom.

Correct : A. Well

34. a _____ are open at bottom and closed at top.

Correct : D. Pneumatic caissons

35. which the given method is used for dewatering of the foundation trenches.

Correct : C. Well point system

36. in case of releasing artesian pressure, which precaution should be taken when the system of well points is adopted.

Correct : D. Blowing action

37. the organic chemicals include epoxy resin, polyester resin and other resins are used in which method of dewatering of the foundation trenches.

Correct : C. Chemical grouting

38. from given below, which method for the dewatering of foundation trenches is portable and can be easily moved when required.

Correct : A. Pumping

39. in which method a refrigeration plan of required capacity is need to be installed near the site of work.

Correct : C. Freezing process

40. ______ process consists of making a number of holes in the ground and then filling these holes by the cement grout under pressure.

Correct : B. Cement grouting

41. the formwork from the sides of beams can be removed only after

Correct : A. 1 day

42. the form work from the underside of slabs, can be removed only after

Correct : C. 7 days

43. the arrangement of supporting an existing structure by providing supports underneath, is known as

Correct : B. Underpinning

44. a temporary rigid structure having platforms to enable masons to work at different stages of a building, is known as

Correct : A. Scaffolding

45. pyramid is a type of ______ structure.

Correct : B. Massive

46. Pneumatic structure contains:

Correct : D. Compressed air

47. _______ is a self-propelled machine which is used mainly to exert a powerful tractive force for pulling other machines.

Correct : A. Tractor

48. a ______ is a very useful equipment and it can be used for construction work like to clear the site of work, to make the land level, etc.

Correct : D. Bulldozer

49. the size of the bulldozer is indicated by the dimension of its ______

Correct : D. Blades

50. a______ can be used on wet ground and in all conditions of weather.

Correct : D. Bulldozer

51. a ______ is used to level the ground and spreads the loose material.

Correct : C. Grader

52. a grader which is told by a tractor is known as _________.

Correct : D. Elevating grader

53. _______ consists of a large bucket which is attached to a tractor.

Correct : B. Scraper

54. ______ are usually mounted on two or four pneumatic tyred wheels.

Correct : A. Scraper

55. a ______ is an oldest type of machine which removes earth.

Correct : B. Excavator

56. ______ type of excavator used for digging the foundation trenches below operating level.

Correct : B. Backactor

57. ______ type of excavator is used for digging below, at or above operating level in a vertical range.

Correct : C. Clamshell

58. _______ type of excavator carries shovel at its lower end.

Correct : A. Power shovel

59. ______ type of excavator is used for digging at or below the operating level.

Correct : B. Dragline

60. ______ type of excavator carries the skimmer at its lower end.

Correct : A. Skimmer

61. a _____ roller is a multi-purpose roller which is used for various purposes and for practically all type of roads.

Correct : A. Smooth wheeled

62. effective compaction is not achieved by ________.

Correct : D. Smooth wheeled

63. ______ consists of a vibrating unit mounted on a screed, plate or roller.

Correct : D. Vibratory compactors

64. the ______ compact soil close to the earth surface only.

Correct : A. Earth rammers

65. ______ are the most commonly used equipment for transportation.

Correct : C. Trucks

66. the trucks with automatic unloading device are called ______.

Correct : D. Dump tracks

67. ______ are very useful for horizontal transportation of materials like bricks, aggregates, scaffoldings, etc.

Correct : C. Dumpers

68. ______ are extra wagons attached to the tractors or trucks.

Correct : C. Trailers

69. ______ are used for vertical transportation of aggregate and wet concrete on large project sites.

Correct : A. Elevators

70. in order to raise and shift heavy loads from one place to another, they ______ are employed in the construction of big works.

Correct : C. Cranes

71. ______ crane is used for open sites and it possesses a very long reach.

Correct : B. Derrick

72. in ______ type of crane, heavy temporary staging or platform is prepared for the working of the crane.

Correct : C. Goliath

73. ______ are cranes of swing jib type and are mounted on high steel towers.

Correct : C. Tower

74. the removal of earth for highway formation is ______.

Correct : C. Excavation

75. the best time to remove soil is during ______.

Correct : A. Summer

76. what is the equipment used for short haul distance of 100 m?

Correct : A. Bulldozer

77. the blade angle of bulldozer is usually ______.

Correct : B. 90

78. the precise control of excavation is possible by _______.

Correct : A. Scrapper

79. the boom is supported by _______.

Correct : C. Hoist line

80. dragline cannot excavate _______.

Correct : D. Stiff material

81. the stiff materials can be excavated by ______.

Correct : B. Hoe

82. the equipment having a bucket is?

Correct : B. Clam shell

83. the compaction of sand is done by ______.

Correct : D. Jetting

84. the term _____ is used to indicate the process of allocating a prepaid expense to accounting periods during which there are benefits realized from the depreciable equipment.

Correct : A. Cost depreciation

85. in ______ method, it is assumed that a property loses its value by the same amount every year.

Correct : D. Straight line method

86. in ______ method, the depreciation of properties assumed to be equal to the annual sinking fund plus the interest on the fund for that year.

Correct : A. Sinking fund

87. in _______, the owner has to invest a certain amount for the purchase of an equipment.

Correct : B. Investment charges

88. the term _____ is used to indicate the period during which the equipment is not in ideal condition.

Correct : B. Downtime