Software Testing and Quality Assurance (STQA) | Set 2
1. Plasma panel have resolution.
Correct : A. high
2. First graphical user interface used commercially was introduced in
Correct : A. 1975
3. What is/are the main component / components of user interface ?
Correct : A. presentation language
4. Which one is the basic input device in GUI
Correct : A. mouse
5. Which of the following model put much more emphasis on testing?
Correct : D. v-v model
6. Independent modules are easier to maintain and test because of.
Correct : D. all of the above.
7. Which of the following option is not tracked by configuration management tools?
Correct : D. none of the mentioned
8. Which of the following is not a Software Configuration Management Activity?
Correct : B. risk management
9. The definition and use of configuration management standards is essential for quality certification in
Correct : D. all of the mentioned
10. Client/server architectures cannot be properly tested because network load is highly variable.
Correct : B. false
11. Which of the following is / are types of Software Maintenance?
Correct : D. all of the above
12. _______ is a Software Configuration Management concept that helps us to control change.
Correct : A. baseline
13. Software Configuration Management (SCM) is an umbrella activity.
Correct : A. true
14. What is the main aim of Software Configuration Management (SCM)?
Correct : D. all of theabove
15. Select which option is not true about SQA…?
Correct : C. evaluations to be performed
16. A product which is manufactured by using the degree of the design specification…
Correct : A. quality of conformance
17. Which of the following is not included in prevention cost?
Correct : A. equipment calibration and maintenance
18. Select the people who identify the document and verifies the correctness of the software…
Correct : B. sqa team
19. Select the option which is not an appraisal in SQA?
Correct : D. quality planning
20. What does Qa and QC stands for
Correct : A. quality assurance and quality control
21. Which of the following is not a SQA plan for a project?
Correct : B. amount of technical work
22. Which of the following is not included in External failure costs?
Correct : A. testing
23. Who identifies, documents, and verifies that corrections have been made to the software?
Correct : C. sqa group
24. Quality also can be looked at in terms of user satisfaction which includes
Correct : D. all of the mentioned
25. Which of the following is not a core step of Six Sigma?
Correct : B. control
26. Non-conformance to software requirements is known as
Correct : C. software failure
27. According to ISO 9001, inspection and testing comes under which management responsibility?
Correct : A. process control
28. Alpha testing is done at
Correct : A. developer???s end
29. Which of the following term describes testing?
Correct : B. evaluating deliverable to find errors
30. Behavioral testing is
Correct : B. black bozx testing
31. In which testing level the focus is on customer usage?
Correct : D. both a and b
32. Which testing is an integration testing approach that is commonly used when “shrink-wrapped” software products are being developed?
Correct : C. smoke testing
33. Testing of individua l components by the developers are comes under which type of testing?
Correct : C. unit testing
34. When different combination of input requires different combination of actions,Which of the following technique is used in such situation
Correct : C. decision table
35. Which of the following is a myth in testing?
Correct : B. any user can test software
36. ISO published the standard in __________
Correct : A. 1987
37. -----------is theapplication of quality principles to all facets and business process of an organization.
Correct : A. tqm
38. .Innovation is the activity leading to
changes.
Correct : A. planned
39. Quality management system of a organization based on which pillars
Correct : B. quality processes, guidelines and standards & formats and templates
40. V-model uses test models
Correct : B. not fix
41. Which of the following is a principle of total quality management?
Correct : C. continuous value enhancement
42. The difference between and internal and an external customer is:
Correct : B. quality-oriented businesses care only about external customers.
43. Costs associated with efforts to prevent errors are
Correct : A. appraisal cost
44. What is meant by Kaizen?
Correct : C. change for better quality
45. What is the aim of fool proofing technique used for total quality management?
Correct : A. to achieve zero defects
46. ISO 14000 quality standard is related with
Correct : A. environmental management systems
47. What is quality assurance?
Correct : A. quality assurance deals with activities which prove that products and services meet the required quality standard
48. Which of the following statements is/are false?
1. Fault tree analysis method is used to determine reliability of product
2. The goal of Six Sigma is to reduce number of defects to 2.4 parts per billion
3. Six sigma is represented by normal distribution curve
4. Poka yoke is a policy which prevents occurrence of human errors
Correct : C. only statement 2
49. The aim of Just-In-Time manufacturing principle is to eliminate
Correct : D. all of the mentioned
50. To what does the ISO 9000 standards family apply?
Correct : A. calibration
51. "The degree to which a set of inherent characteristics of an object fulfils requirements" is known as
Correct : A. conformity
52. Which of the following is not one of the seven Quality Management Principles?
Correct : A. system approach to management
53. The role of management is to ____________________
Correct : C. both a and b
54. ISO – 14001 gives stress on ___________
Correct : D. all of the above
55. Service Assurance is _______
Correct : D. all of the above
56. When a manager monitors the work performance of workers in his department to determine if the quality of their work is 'up to standard', this manager is engaging in which function?
Correct : B. controlling
57. What are the three C'c of TQM?
Correct : C. cultural, comunication and contribution
58. ______________ is not a process tools for TQM systems
Correct : C. lpier
59. Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below defects per million
opportunities (DPMO).
Correct : D. 3.4
60. ______________ are used in six sigma
Correct : C. both a and b
61. Customers are primarily concerned with
______________
Correct : A. communicatio n, courtesy, and credibility of the sales person
62. Assured quality is necessary for building customer confidence.
Correct : A. correct
63. "Quality is defined by the customer" is
Correct : B. a user-based definition of quality
64. Deming's 4 step cycle for improvement is______________
Correct : A. plan, do, check, act
65. In Six Sigma, a is defined as any
process output that does not meet customer specifications
Correct : D. defect
66. Quality practices must be carried out ______________
Correct : B. throuout the life of the project
67. The Pareto Chart is a bar chart that allows for analysis of data in search of the Pareto Principle or the _______________________
Correct : A. 80/20 rule.
68. The pareto chart is a that
allows us to focus on the issues that are causing the biggest problem, and thus maximize our impact.
Correct : A. prioritization tool
69. The Cause and Effect diagram is a visual tool to explore all the that may be causing
or contributing to a particular problem
Correct : A. potential factors
70. Data are onthe check sheet to record
the frequency of specific events during a datacollection period.
Correct : A. “collected and tabulated”
71. Histogram is very useful tool to describe a of the frequencydistribution of
observed values of a variable
Correct : A. sense
72. The diagram is a problem-solving tool
that investigates and analizessystematically all the potential or real causes that result in a single effect.
Correct : A. cause and effect
73. Which of the following does not affect the software quality and organizational performance?
Correct : A. market
74. Which of the following is an indirect measure of product?
Correct : D. all of the above
75. A graphical technique for finding if changes and variation in metrics data are meaningful is known as
Correct : C. control chart
76. What encapsulates state data and services in a manner that is analogous to objects?
Correct : A. state box
77. MTTF stands for _______________________
Correct : B. mean-time-to-fa ilure
78. A is an existing defect that hasn’t yet ust because
another defect has yet caused a failure because the exact set of conditions were never met.
Correct : C. latent defect
79. Which of the following is not a state of a defect in defect life cycle:
Correct : D. critical
80. ........... happens when defect introduced in one phase passes to another phase without getting caught in the phase-end verification or validation activities.
Correct : D. defect leakage
81. Defect is a technique that was developed to
estimate the number of defects resident in a piece of software.
Correct : B. seeding
82. The main focus of is to reduce defects and
variations in the processes.
Correct : C. six sigma
83. Who among the following suggested seven quality tools for controlling quality?
Correct : B. kaoru ishikawa
84. Which among the following depicts positive and negative relation between driving factor and performance factor?
Correct : A. scatter diagram
85. Which of the following is the limitation of Quality circle?
Correct : B. training time and cost
86. Which of the following is the task ofproject indicators:
Correct : C. help in assessment of status of ongoing project and track potential risk
87. The intent of project metrics is :
Correct : D. minimization of development schedule and assessing project quality on going basis
88. Inspections and testing are what kinds of Quality Costs?
Correct : D. appraisal
89. -----------is the ability to encourage by "push or pull" technical people to produce to their best ability.
Correct : B. motivation
90. Which of the following is responsible for the quality objective?
Correct : A. top level management
91. Select the operating system which is not supported by Selenium IDE
Correct : A. unix
92. The Selenium RC is used
Correct : A. to run your test against different browers on different opearting systems
93. Out of the following which can only test web applications
Correct : B. selenium
94. Select the component which is not part of Selenium Suite
Correct : D. selenium web
95. Select the language which is not supported by the Selenium RC
Correct : A. asp
96. Select the name which is not the type of locators
Correct : C. password
97. The Web Driver is used
Correct : A. to execute tests on the html unit browser
98. The Selenium IDE is used
Correct : D. to test a web application against firefox only
99. Select the browser which is supported by Selenium IDE
Correct : C. mozilla firefox
100. Selenium IDE stands for
Correct : C. selenium integrated development environment