Quiznetik

Software Testing and Quality Assurance (STQA) | Set 4

1. Executing the same test case by giving the number of inputs on same build called as

Correct : B. retesting

2. Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.

Correct : A. true

3. To check whether we are developing the right product according to the customer requirements are not. It is a static process

Correct : B. verification

4. To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.

Correct : A. validation

5. Staff development plan describes how the skills and experience of the project team members will be developed.

Correct : A. true

6. It is a set of levels that defines a testing maturity hierarchy

Correct : B. tmm (testing maturity model)

7. A Non-Functional Software testing done to check if the user interface is easy to use and understand

Correct : A. usability testing

8. The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as

Correct : B. baseline document

9. What are the Testing Levels?

Correct : D. all the above

10. Cost of quality = Prevention Cost + Appraisal cost + Failure cost

Correct : A. true

11. A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?

Correct : B. cause-and-effect diagram

12. It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.

Correct : C. quality assurance

13. Variance from product specifications is called?

Correct : C. defect

14. Verification is

Correct : A. process based

15. White box testing is not called as___________

Correct : B. closed box testing

16. Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as

Correct : A. pareto analysis

17. Retesting of a single program or component after a change has been made?

Correct : B. unit regression

18. Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)

Correct : A. true

19. The testing which is done by going thro' the code is known as,

Correct : C. white box testing

20. Configuration Management Plan describes the Configuration Management procedures and structures to be used.

Correct : A. true

21. This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as

Correct : C. black box testing

22. Phase Definition. It will come under

Correct : B. cmm level 2

23. Software testing which is done without planning and Documentation is known as

Correct : A. adhoc testing

24. Acceptance testing is known as

Correct : A. beta testing

25. Retesting the entire application after a change has been made called as?

Correct : A. full regression testing

26. Boundary value analysis belongs to which testing method?

Correct : A. black box testing

27. It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product.

Correct : D. quality control

28. What are the Types of Integration Testing?

Correct : D. all the above

29. Product Risk affects The quality or performance of the software.

Correct : A. true

30. A metric used to measure the characteristic of documentation and code called as

Correct : B. product metric

31. Which is non-functional software testing?

Correct : C. performance testing

32. The process that deals with the technical and management issues of software development called as?

Correct : C. software process

33. Executing the same test case on a modified build called as

Correct : A. regression testing

34. Which is Black-Box Testing method?

Correct : A. equivalence partitioning

35. Business Risk affects The Organization developing or Procuring the software.

Correct : A. true

36. Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(stratA..

Correct : A. true

37. Informing to the developer which bug to be fix first is called as

Correct : B. priority

38. Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.

Correct : A. true

39. Retesting modules connected to the program or component after a change has been made?

Correct : C. regional regression

40. An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under

Correct : C. test metric

41. Alpha testing will be done at,

Correct : B. developers\ site

42. SPICE Means

Correct : A. software process improvement and capability determination

43. It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.

Correct : A. tim (testing improving model)

44. Standards and procedures for managing changes in an evolving software product is called?

Correct : C. configuration management

45. Path Tested = Number of Path Tested / Total Number of Paths

Correct : A. true

46. This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as

Correct : B. white box testing

47. This type of test include, how well the user will be able to understand and interact with the system?

Correct : A. usability testing

48. Defects generally fall into the following categories?

Correct : D. all the above

49. What is correct Software Process Cycle?

Correct : B. plan(p)------>do(d)------>check(c)----->act(a)

50. Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as

Correct : B. stress/load testing

51. Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required

Correct : A. true

52. Beta testing will be done by

Correct : B. user

53. Validation plan describes the approach ,resources and schedule used for system validation

Correct : A. true

54. Integration, It will come under

Correct : B. cmm level 3

55. Types of quality tools are Problem Identification Tools and Problem Analysis Tools.

Correct : A. true

56. Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

Correct : C. v-model

57. A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

Correct : A. process metric

58. Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.

Correct : A. true

59. Application should be stable. Clear Design and Flow of the application is needed for Automation testing.

Correct : B. true

60. Quality plan describes the quality procedures and standards that will be used in a project.

Correct : B. true

61. How severely the bug is effecting the application is called as

Correct : A. severity

62. Project Risk affects The Schedule or Resources.

Correct : A. true

63. The name of the testing which is done to make sure the existing features are not affected by new changes

Correct : D. regression testing

64. Management and Measurement, It will come under

Correct : C. cmm level 4

65. AdHoc testing is a part of

Correct : C. exploratory testing

66. Cost of Production = Right The First time cost(RTF. + Cost of Quality.

Correct : A. true

67. ------------- means under what test environment(Hardware, software set up. the application will run smoothly

Correct : A. test bed

68. TQM represents

Correct : C. total quality management

69. Optimization, Defect Prevention, and Quality Control. Its come under the

Correct : D. cmm level5

70. Unit Testing will be done by

Correct : D. developers

71. Beta testing will be done at

Correct : A. user place

72. A Plan to overcome the risk called as

Correct : D. mitigation plan

73. Which of the following is not included in failure costs?

Correct : D. none of the mentioned

74. Which requirements are the foundation from which quality is measured?

Correct : B. software

75. Which of the following is not a SQA plan for a project?

Correct : B. amount of technical work

76. Degree to which design specifications are followed in manufacturing the product is called

Correct : B. quality of conformance

77. Which of the following is not an appraisal cost in SQA?

Correct : C. quality planning

78. Who identifies, documents, and verifies that corrections have been made to the software?

Correct : C. sqa group

79. What is not included in prevention costs?

Correct : D. equipment calibration and maintenance

80. Quality Management in software engineering is also known as

Correct : A. sqa

81. Which of the following is not a core step of Six Sigma?

Correct : B. control

82. Non-conformance to software requirements is known as

Correct : C. software failure

83. What kind of quality cost is incurred when an error is detected in a product prior to shipment?

Correct : B. internal failure

84. The degree to which the design specifications are followed during manufacturing is known as

Correct : B. quality of conformance

85. Alpha testing is done at

Correct : A. developer‟s end

86. Exhaustive testing is

Correct : C. impractical but possible

87. White Box techniques are also classified as

Correct : B. structural testing

88. Which of the following term describes testing?

Correct : B. evaluating deliverable to find errors

89. The testing in which code is checked

Correct : B. white box testing

90. Acceptance testing is also known as

Correct : D. beta testing

91. Which of the following is non-functional testing?

Correct : B. performance testing

92. Beta testing is done at

Correct : A. user‟s end

93. Unit testing is done by

Correct : B. developers

94. Behavioral testing is

Correct : B. black box testing

95. Which of the following is black box testing

Correct : B. boundary value analysis

96. In which testing level the focus is on customer usage?

Correct : D. both alpha and beta

97. What is normally considered as an adjunct to the coding step

Correct : B. unit testing

98. What is the main purpose of integration testing?

Correct : B. interface errors

99. Testing of individual components by the developers are comes under which type of testing?

Correct : C. unit testing

100. When the Testing Principles are useful while building the Software Product?

Correct : D. throughout life-cycle