11. A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?
Correct : B. cause-and-effect diagram
12. It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.
Correct : C. quality assurance
13. Variance from product specifications is called?
Correct : C. defect
14. Verification is
Correct : A. process based
15. White box testing is not called as___________
Correct : B. closed box testing
16. Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
Correct : A. pareto analysis
17. Retesting of a single program or component after a change has been made?
Correct : B. unit regression
18. Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)
Correct : A. true
19. The testing which is done by going thro' the code is known as,
Correct : C. white box testing
20. Configuration Management Plan describes the Configuration Management procedures and structures to be used.
Correct : A. true
21. This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as
Correct : C. black box testing
22. Phase Definition. It will come under
Correct : B. cmm level 2
23. Software testing which is done without planning and Documentation is known as
Correct : A. adhoc testing
24. Acceptance testing is known as
Correct : A. beta testing
25. Retesting the entire application after a change has been made called as?
Correct : A. full regression testing
26. Boundary value analysis belongs to which testing method?
Correct : A. black box testing
27. It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product.
Correct : D. quality control
28. What are the Types of Integration Testing?
Correct : D. all the above
29. Product Risk affects The quality or performance of the software.
Correct : A. true
30. A metric used to measure the characteristic of documentation and code called as
Correct : B. product metric
31. Which is non-functional software testing?
Correct : C. performance testing
32. The process that deals with the technical and management issues of software development called as?
Correct : C. software process
33. Executing the same test case on a modified build called as
Correct : A. regression testing
34. Which is Black-Box Testing method?
Correct : A. equivalence partitioning
35. Business Risk affects The Organization developing or Procuring the software.
Correct : A. true
36. Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(stratA..
Correct : A. true
37. Informing to the developer which bug to be fix first is called as
Correct : B. priority
38. Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.
Correct : A. true
39. Retesting modules connected to the program or component after a change has been made?
Correct : C. regional regression
40. An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
Correct : C. test metric
41. Alpha testing will be done at,
Correct : B. developers\ site
42. SPICE Means
Correct : A. software process improvement and capability determination
43. It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.
Correct : A. tim (testing improving model)
44. Standards and procedures for managing changes in an evolving software product is called?
Correct : C. configuration management
45. Path Tested = Number of Path Tested / Total Number of Paths
Correct : A. true
46. This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as
Correct : B. white box testing
47. This type of test include, how well the user will be able to understand and interact with the system?
Correct : A. usability testing
48. Defects generally fall into the following categories?
Correct : D. all the above
49. What is correct Software Process Cycle?
Correct : B. plan(p)------>do(d)------>check(c)----->act(a)
50. Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as
Correct : B. stress/load testing
51. Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required
Correct : A. true
52. Beta testing will be done by
Correct : B. user
53. Validation plan describes the approach ,resources and schedule used for system validation
Correct : A. true
54. Integration, It will come under
Correct : B. cmm level 3
55. Types of quality tools are Problem Identification Tools and Problem Analysis Tools.
Correct : A. true
56. Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself
Correct : C. v-model
57. A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as
Correct : A. process metric
58. Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.
Correct : A. true
59. Application should be stable. Clear Design and Flow of the application is needed for Automation testing.
Correct : B. true
60. Quality plan describes the quality procedures and standards that will be used in a project.
Correct : B. true
61. How severely the bug is effecting the application is called as
Correct : A. severity
62. Project Risk affects The Schedule or Resources.
Correct : A. true
63. The name of the testing which is done to make sure the existing features are not affected by new changes
Correct : D. regression testing
64. Management and Measurement, It will come under
Correct : C. cmm level 4
65. AdHoc testing is a part of
Correct : C. exploratory testing
66. Cost of Production = Right The First time cost(RTF. + Cost of Quality.
Correct : A. true
67. ------------- means under what test environment(Hardware, software set up. the application will run smoothly
Correct : A. test bed
68. TQM represents
Correct : C. total quality management
69. Optimization, Defect Prevention, and Quality Control. Its come under the
Correct : D. cmm level5
70. Unit Testing will be done by
Correct : D. developers
71. Beta testing will be done at
Correct : A. user place
72. A Plan to overcome the risk called as
Correct : D. mitigation plan
73. Which of the following is not included in failure costs?
Correct : D. none of the mentioned
74. Which requirements are the foundation from which quality is measured?
Correct : B. software
75. Which of the following is not a SQA plan for a project?
Correct : B. amount of technical work
76. Degree to which design specifications are followed in manufacturing the product is called
Correct : B. quality of conformance
77. Which of the following is not an appraisal cost in SQA?
Correct : C. quality planning
78. Who identifies, documents, and verifies that corrections have been made to the software?
Correct : C. sqa group
79. What is not included in prevention costs?
Correct : D. equipment calibration and maintenance
80. Quality Management in software engineering is also known as
Correct : A. sqa
81. Which of the following is not a core step of Six Sigma?
Correct : B. control
82. Non-conformance to software requirements is known as
Correct : C. software failure
83. What kind of quality cost is incurred when an error is detected in a product prior to shipment?
Correct : B. internal failure
84. The degree to which the design specifications are followed during manufacturing is known as
Correct : B. quality of conformance
85. Alpha testing is done at
Correct : A. developer‟s end
86. Exhaustive testing is
Correct : C. impractical but possible
87. White Box techniques are also classified as
Correct : B. structural testing
88. Which of the following term describes testing?
Correct : B. evaluating deliverable to find errors
89. The testing in which code is checked
Correct : B. white box testing
90. Acceptance testing is also known as
Correct : D. beta testing
91. Which of the following is non-functional testing?
Correct : B. performance testing
92. Beta testing is done at
Correct : A. user‟s end
93. Unit testing is done by
Correct : B. developers
94. Behavioral testing is
Correct : B. black box testing
95. Which of the following is black box testing
Correct : B. boundary value analysis
96. In which testing level the focus is on customer usage?
Correct : D. both alpha and beta
97. What is normally considered as an adjunct to the coding step
Correct : B. unit testing
98. What is the main purpose of integration testing?
Correct : B. interface errors
99. Testing of individual components by the developers are comes under which type of testing?
Correct : C. unit testing
100. When the Testing Principles are useful while building the Software Product?