Production Management | Set 1

1. Which of the following functions is not a core function of an organization

Correct : A. The accounting and finance function

2. Most operation produce a mixture of both products and services which of the following business is closest to producing ‘pure’ services ?

Correct : B. Counselor /therapist

3. Operations can be classified according to their volume and variety of production as well as the degree of variation & visibility . Which of the following operations would be classified as high volume , low variety ?

Correct : D. A fast food restaurant

4. Which of the following activities is not a direct responsibility of operations management?

Correct : C. Determining the exact mix of products and services that customers will want

5. Operations can be classified according to the degree of variations in demand and visibility of the operations as well as their volume and variety of production which of the following operations would be classified as high variation & high visibility ?

Correct : B. A family doctor

6. Which of the following would not be normally be considered a general characteristics of a service?

Correct : C. Production and consumption can always be spatially separated

7. Which of the following would not be normally considered as a key feature of operations management?

Correct : D. Operations is the part of an organization which creates wealth through the management of the transformation process

8. Which of the following is the least likely decision to be made by operations managers ?

Correct : D. Deciding which market areas to manufacture products for

9. Operations management is applicable

Correct : C. Mostly to the manufacturing sector

10. The field of operations management is shaped by advances in which of the following fields?

Correct : B. Industrial engineering & management science

11. The five element in the management process are

Correct : C. Organize , plan , control, staff and manage

12. The responsibilities of the operations manager include

Correct : D. Planning , organizing , staffing , leading , and controlling

13. Which of the following is not an element of management process

Correct : A. Pricing

14. Which of the following illustrate an activity that does not add value?

Correct : D. Accumulating parts in front of the next work centre

15. Which of the following statements regarding a pull system is true ?

Correct : D. Problems become more obvious

16. Which one of the following is a concern expressed by suppliers ?

Correct : C. Production with zero defects

17. Reduction of in-transit inventory encouraged through use of

Correct : A. Supplier location near plants

18. Which of the following is not a benefit of small production lots ?

Correct : B. Fewer setups

19. Flexible manufacturing systems (FMS) are reported to have a number of benefits . which is not a reported benefits of FMS?

Correct : B. More flexible than the manufacturing systems they replace

20. Process technologies differ in their flexibility capabilities and economics and will therefore be appropriate for different parts of the volume – variety matrix. Flexible manufacturing systems are usually

Correct : C. Mid variety , mid volume

21. What do flexible manufacturing systems (FMS) do?

Correct : D. Completely manufactures a range of components without significant human inventions during the processing

22. Which of the following is true regarding forward scheduling? Forward scheduling is the scheduling of

Correct : B. Jobs as soon as the requirements are known

23. Which of the following best describes how short term schedules are prepared? short term schedules are prepared

Correct : D. From master schedules which are derived from aggregate plans

24. Which scheduling technique should be employed when due dates are important for a job order ?

Correct : D. Backward scheduling

25. Which of the following is not effectiveness criterion for scheduling?

Correct : A. Maximizing flow time

26. Forward scheduling

Correct : D. Assumes that procurement of material and operations start as soon as requirement are known

27. Which file contain important information regarding on items flow through the shop ?

Correct : A. Routing file

28. Which of the following is not a part of the planning files of a production planning and control systems

Correct : A. A progress file

29. Which of the following files trucks work order progress ?

Correct : D. Control files

30. The production data base containing information about each of the components that a firm produces or purchases is the

Correct : D. Item master files

31. The short term scheduling activity called loading

Correct : C. Assigns jobs to work centers

32. Sequencing (or dispatching)

Correct : C. Specifies the order in which job should be done at each centre

33. Use of sequencing role shortest processing time generally result in

Correct : D. Minimum average flow time

34. Resources such as labour materials and energy are known as ……………. In the transformation process

Correct : D. Inputs

35. The raw materials , components , completed or partially completed products ,and pieces of equipment a firm uses are often referred to as

Correct : A. Inventory

36. In a large company , the department charged with determining the actual process to be used in turning inputs to output is

Correct : C. Operations

37. Getting products to consumers obtaining and managing raw materials and packaging finished products are all activities of

Correct : D. Materials management

38. The development and administration of the activities involved in transforming resources into goods and services is known as

Correct : A. Operations management

39. Which of the following is not difference between manufacturers and service providers

Correct : A. Nature and consumption of output

40. The process through which inputs are converted into output is referred to as

Correct : A. The transformation process

41. The degree to which a good or service meets demands and requirements of customers called

Correct : B. Customer satisfaction

42. Making identical , interchangeable components or complete products is referred to as

Correct : B. Standardization

43. Unique products are generally produced through

Correct : A. Customization

44. Procurement is another name for

Correct : A. Consumption

45. Which of the following is the sequence of operations through which product must pass

Correct : D. Routing

46. A planning systems that schedules the precise quantity of materials needed to make a product is called

Correct : C. Materials requirements planning

47. The activities and process used in making both tangible and intangible products is known as

Correct : B. Production

48. Customers perceptions are important in

Correct : C. Product specification

49. Which of the following is not a function of purchasing management

Correct : D. None of these

50. Which of the following would not generally be a motive for a firm to hold inventories?

Correct : D. To minimize holding costs

51. All of the following statements about ABC analysis are true except

Correct : D. It states that all items require the same degree of control

52. ABC analysis is based upon the principal that

Correct : B. These are very usually a few critical items zmd many items which are less critical

53. Which of the following statements about ABC analysis is false?

Correct : D. ABC analysis is based on the presumption that all item must be tightly controlled to produce important cost savings

54. The two most basic inventory questions answered by the typical inventory model are

Correct : C. Timing and quantity of orders

55. Ascertain type of computer costs 1000 and the annual holding cost is 25% . annual demand is 10000 units , and the order cost is 150 per order .what is the approximate economic order quantity?

Correct : B. 110

56. Most inventory models attempt to minimize

Correct : C. Total inventory based costs

57. In basic EOQ model if the cost of placing an order doubles and all other values remain constant the EOQ will

Correct : A. Increase by about 41%

58. Which of the following statements about the basic EOQ model is true

Correct : A. If ordering cost were to double , the EOQ would rise

59. Which of the following statements about the basic EOQ model is false?

Correct : D. If annual demand were to double , the EOQ would also double

60. Time and motion studies focus on

Correct : B. The number of physical motion required to complete a work related task

61. Scientific management contributed to the development of a more rational approach to management by developing which characteristics?

Correct : B. Time and motion studies

62. A situations in which manager can make an accurate decision is called

Correct : A. Certainty

63. Time and motion study was introduced by

Correct : B. F.W Taylor

64. The fixed position layout would be most appropriate in which of the following cases

Correct : D. Constructing a Boeing277

65. For which of the following operations would a fixed position layout be most appropriate

Correct : D. Refining of crude oil

66. Because the fixed position layout is so difficult to solve on-site operations managers

Correct : D. Often complete as much of the project as possible off site

67. One factor impacting the fixed position input strategy is

Correct : D. The movement of material to the limited storage areas around the site

68. One of the major advantage of process oriented layout is

Correct : C. Flexibility in equipment and labour assignment

69. The man issue is designing process oriented input concerns the relative positioning of …………… to minimize cost of material handling

Correct : B. Departments

70. A process layout would be most appropriate in which of the following cases

Correct : D. A garment restaurant

71. The major problem addressed

Correct : D. Minimizing difficulties caused by material flow varying with each product

72. The most common tactic followed in process – layout planning is to arrange departments or work centers so they

Correct : D. Minimize the costs of material handling

73. Process oriented layout is best suited for

Correct : D. Low volume , high variety production

74. Which of the following is true for process layouts , hut false for production layouts ?

Correct : B. Flexibility in equipment and labour arrangement

75. Big advantage of process oriented layout is

Correct : A. Its flexibility for variety

76. The typical goal used when developing a process oriented layout strategy is to

Correct : B. Minimize the material handling costs

77. The concept of total quality control i.e that quality must be attended to at all stages of the industrial cycle and throughout the organization is the creation of which of the following pioneers ?

Correct : C. Arnald Feigenbaum

78. The so-called ‘quality qurus’ of Total Quality Management (TQM) do not include one of the following

Correct : C. Bill coshy

79. Which of the following would not normally be considered as a ‘costs of quality’

Correct : D. Rand D costs

80. ………………. Focused on the job and how to do it better

Correct : A. Scientific management

81. What term describes a vertical expansion of job duties in order to give the worker more responsibility?

Correct : C. Job enrichment

82. What are the two basic types of production systems?

Correct : B. Intermittent and non-intermittent process

83. What type of process would a paper mill be most likely to use?

Correct : A. Continuous flow

84. What technique deals with the problem of supplying sufficient facilities to production lines or individuals that require uneven service?

Correct : D. Queuing theory

85. A manufacturer has been receiving excessive numbers of defective standard machine parts from a vendor on a regular basis. What is the most effective way to design a formal inspection system for incoming parts?

Correct : C. Statistical quality control

86. A set of simultaneous equations that has more variables than constraints has

Correct : B. an infinite number of solutions

87. In a PERT/CPM network, computing the critical path requires

Correct : B. assigning the earliest finish time for an activity as the earliest start time for the next

88. At the completion of the forward and backward passes, the slack for an activity is given by the

Correct : A. difference between early start and early finish

89. What type of control chart is used to monitor the number of defects per unit?

Correct : C. c-chart

90. The operating characteristic (OC) curve shows the probability of

Correct : B. acceptance for every possible true percentage of defectives

91. If an artificial variable remains in the solution with a positive value after the stopping criterion has been reached, the problem

Correct : A. is infeasible

92. . What are the two sources of costs in queuing analysis?

Correct : C. Waiting customers and capacity

93. The transportation model method that is used to evaluate location alternatives minimizes total

Correct : D. shipping costs

94. What is simulation?

Correct : D. A trial-and-error approach to problem-solving

95. Moving from the aggregate plan to a master production schedule requires

Correct : C. disaggregation

96. A fixed interval system

Correct : B. is suitable for joint replenishment items

97. _________is a process in which a supplier generates orders for its distributor based on demand information sent by the distributor

Correct : D. vendor managed inventory

98. Which of the following classification of scheduling strategies is not practical in case of machine breakdown?

Correct : B. Detailed scheduling

99. Which of the following chart will indicate only the cumulative workloads for each job and to what extent the work centers are to be scheduled?

Correct : B. Gantt chart

100. ________________ is a methodology by which we try to minimize the cost and improve the revenue of a product or an operation.

Correct : A. Value engineering